Description

Tseung Kwan O – Lam Tin Tunnel – Road P2/D4 and Associated Works mainly comprise construction of a section of Road P2 in TKO Town Centre, modification of the existing road junction at Po Yap Road/ Po Shun Road/ Chui Ling Road and construction of a grade separated footbridge cum cycle track.

Contract No. NE/2017/02
Scope
  • Construction of a section of Road P2 in TKO Town Centre;
  • Modification of the existing road junction at Po Yap Road/Po Shun Road/Chui Ling Road into a signalised junction;
  • Construction of a grade seprated footbridge cum cycle track (namely the Southern Footbridge with provision of lifts; and
  • Junction Improvement at Po Yap Road/Tong Yin Street.
Commencement Date
30 November 2017
Tentative Completion Date 2021
Contract Sum $257 million
Consultant AECOM Asia Company Limited
Contractor Zhen Hua Engineering Company Limited



Site Plan




Works Progress / What's New

March 2019

February 2019

AERIAL PHOTO OF WORKSITE

January 2019

AERIAL PHOTO OF WORKSITE

December 2018

AERIAL PHOTO OF WORKSITE

November 2018

AERIAL PHOTO OF WORKSITE

October 2018

AERIAL PHOTO OF WORKSITE

September 2018

AERIAL PHOTO OF WORKSITE

August 2018

AERIAL PHOTO OF WORKSITE

July 2018




Contact Us

You are welcome to provide your valuable comments to us by the following ways:

Post: Civil Engineering and Development Department
East Development Office
Suite 1213, Chinachem Golden Plaza, 77 Mody Road, Tsim Sha Tsui East, Kowloon
Telephone: 5599 7455
Fax: 3910 1600
Email: tkoltt@cedd.gov.hk



Related Links

Civil Engineering and Development Department
Environmental Monitoring and Audit Data and Reports for Tseung Kwan O - Lam Tin Tunnel Project
Tseung Kwan O - Lam Tin Tunnel